Module 2: Efficiency
Case Studies
1. Heathrow Terminal 5 (2002)
Module 2 Enquiry 3
Activity 2.2.5
You may be thinking that it is time for a change from Birmingham North Relief Road. A similar approach, examining the perspectives and analysing the costs and benefits, could be used with the story of Heathrow Terminal 5.
Heathrow Terminal 5: November 2001, Final Approval, provides a general briefing.
A Village in Despair looks at the views of the local community.
Viewpoints identifies a range of stakeholder positions.
activity (
, 52 KB)
A Village In Despair (
, 10 KB)
Viewpoints (
, 6 KB)